NELSON Factory

Contact us 1-808-575-7667
  • Products
  • About us
  • The Factory
    • Our Services
    • CNC Machine
    • Production
      • Videos 1-4
      • Videos 5-8
      • Videos 9-12
    • 360° Boards
    • Virtual Tour
  • Gallery
  • Contact us

Video's five through eight of our production cycle.

In the following four video's, we cover grinding back the deck sandwich, installing the inserts, to applying the deck and grinding back.
Video 5
Click to Play
Pulling and grinding back the deck sandwich, to routing and installing the high density block for the fin box.Download the movie. Size: 20,3 MB
Video 6
Click to Play
Fine tuning the deck sandwich, the bottom rocker, shape, and marking all the insert placements.Download the movie. Size: 65,3 MB
Video 7
Click to Play
Routing the deck and fin box, prepping, and installing all the inserts, and then grinding back.Download the movie. Size: 48,7 MB
Video 8
Click to Play
Prepping and applying the deck lamination, pulling and then grinding back in preparation for the bottom lamination.Download the movie. Size: 71,7 MB
Page 2/3 Previous Next
  • Windsurf Boards |
  • Stand Up Paddle Boards |
  • Surf Boards |
  • Production Boards |
  • About us |
  • The Factory |
  • Contact us
Nelson Factory, 375 West Kuiaha Road, Unit 19 Haiku HI 96708, Phone: +1 808 575 7667
Disclaimer | copyright © 2010 nelsonfactory.com